Storage, Operation, Maintenance – Campbell Hausfeld IN730100AV User Manual

Page 12

Advertising
background image

FIrINg tHe NaIler
1. Load fasteners (see Loading / Unloading the Nailer section).

2. Connect the air supply to the nailer.

An improperly functioning tool must not be used. Do not actuate

the tool unless the tool is placed firmly against the work piece.

In Sequential Mode

1. Fully depress WCE.

2. Pull trigger. Fastener will be driven into workpiece.

Storage

The nailer should be stored in a cool dry location.

Operation

Figure 15

CHN71500

www.chpower.com

Operating Instructions and Parts Manual

12

Figure 14

Then pull trigger.

Work Surface

Depress WCE first...

Work Surface

Maintenance

ClearINg a jaM FroM tHe NaIler
1. Disconnect nailer from air supply.

2. Remove all nails from the magazine (see Loading/ Unloading). Failure to do so may

cause the nails to eject from the front of the nailer.

3. Completely remove the three (3) small nose screws and the top nose plate to reveal

the jammed fastener.

4. Using caution not to bend or damage the driver blade, use a pick or some other

pointed object to pry free and clear the jammed fastener.

NaIler rePaIr
Only qualified personnel should repair the tool and they should use genuine Campbell
Hausfeld replacement parts and accessories, or parts and accessories which perform
equivalently.

rePlaCeMeNt Parts

Use only genuine Campbell Hausfeld service parts. Tool performance,

safety and durability could be reduced if improper parts are used. When

ordering replacement parts, specify by part number.

asseMbly ProCedure For seals
When repairing a nailer, the internal parts must be cleaned and lubricated. Parker
O-lube or equivalent must be used on all o-rings. Each o-ring must be coated with
O-lube before assembling. A small amount of oil must be used on all moving surfaces
and pivots.

teCHNICal servICe
For information regarding the operation or repair of this product, please call
1-800-543-6400.

Advertising