Reviewing the site preparation checklist – Cabletron Systems 802.11 User Manual

Page 22

Advertising
background image

Site Preparation Guide

16

Reviewing the Site Preparation Checklist

Lightning protection

√

Determine the mounting location for the lightning rod (positioned near the antenna).

√

Ensure an earth ground location for the antenna structure and lightning arrestor.

Mounting requirements

√

Determine the type of mounting that is required (tripod, wall mount, etc.)

√

Consider that three guy wires are needed for each 10-foot (3 meter) section of the mast;

for example, 20 feet of mast requires six guy wires.

Line of sight

√

Determine the mounting location for the antenna.

√

Ensure that the back of the antenna is clear.

√

Ensure that remote and local antennas can see each other.

√

Ensure that no obstacles are in the direct path or within the defined zone of the two sites.

√

Consider whether any RF interference is present.

Installation Requirements

√

Determine the best location for the Access Point.

√

Determine the length of cable required from the antenna to the Access Point.

√

Ensure the location has an accessible Ethernet connection.

√

Ensure the location has accessible power.

√

Determine the distance between buildings.