KERN & SOHN AEJ 200-4CM User Manual
Page 22
Advertising

Models AEJ/AES-C
• Open glass wind screen on all sides
• Place protection sheet (1) into the weighing chamber
• Place centring ring (2) on the protection sheet
• Put weighing plate (3) on the centring ring
• Place wind protection ring (4) into the weighing chamber
22
AEJ-C/AES-C/PLJ-C-BA-e-1412
Advertising
This manual is related to the following products: