KERN & SOHN IEX 100K-1MEU User Manual

Page 10

Advertising
background image


• Put the weighing pan on the platform balance.

• Position the adapter outside the hazardous area in which an explosive

atmosphere may be expected to be present (that is in a safe place).

• Connect the connecting cable (max. 20 m) to the mains terminal marked DC IN

on the display unit.

1. Mains connection
2. Connection cable
3. Marking PE conductor
4. Shielded load cell cable
5. Sticker power connection

• Prior to initial start-up ensure that there is no risk of explosion –

that is, that no explosive atmosphere is present. If it is obvious
that the balance is not functioning properly, disconnect the
balance from the power supply, secure it and contact KERN
customer services.

10

Doc.No.IEX-BA-e-1412

Advertising
This manual is related to the following products: