KERN & SOHN ILJ 25K-4CM User Manual
Page 15
Advertising

ILJ-C/ILS-C-BA-e-1320
15
6.3 Placing
Remove transport locking (only models ILJ-C)
To detach transport locking device, unscrew locking screw.
For transportation screw in locking screw carefully right up to the limit stop.
Level balance with foot screws until the air bubble of the water balance is in the
prescribed circle
Check levelling regularly
Advertising
This manual is related to the following products: