1 gas supply and piping – LAARS SUMMIT SMW-250 - Install and Operating Manual User Manual

Page 7

Advertising
background image

SUMMIT

BOILER OR WATER HEATER

Page 7

8.

Begin cementing the intake and exhaust pipes,
start at the vent terminals and work back towards
the appliance. Note: The intake terminal is the
90
° elbow fitting that is designed to be
installed facing down.

9.

Support both horizontal vent pipes with pipe
hangers every 5'. The weight of venting must not
be supported by appliance connectors.

10.

Tighten the flexible couplings to connect the
appliance to the vent. DO NOT CEMENT
VENT PIPES TO APPLIANCE — USE
COUPLINGS PROVIDED.

SECTION 3.
Gas Connections

3.1 Gas Supply and Piping

Gas piping should be supported by suitable

hangers or floor stands, not the appliance.

Review the following instructions before

proceeding with the installation.
1.

Verify that the appliance is fitted for the proper
type of gas by checking the rating plate. Laars
Heating Systems appliances are normally
equipped to operate at elevations up to 2000 feet.
However, the SUMMIT appliance will function
properly without the use of high altitude
modification at elevations up to 4500 feet (1372
m). Appliances equipped to operate at higher
altitudes have appropriate stickers or tags
attached (next to the rating plate).

2.

Referring to Table 2, size supply piping to keep
flow capacity to the appliance above 250 cubic
feet per hour (CFH) per installed appliance.

3.

Run gas supply line in accordance with all
applicable codes.

4.

Locate and install manual shutoff valves in
accordance with state and local requirements.

5.

Install drip leg and ground joint union (Figure 6).

6.

All threaded joints should be coated with piping
compound resistant to action of liquefied
petroleum gas.

7.

The SUMMIT appliance and its individual
shutoff valve must be disconnected from the gas
supply piping during any pressure testing of that
system at test pressures in excess of 1/2 PSIG
(3.45kpa).
It must be isolated from the gas supply system
by closing its individual manual shutoff valve
during any pressure testing of the gas supply
piping system at test pressures equal to or less
than 1/2 PSIG (3.45kpa).

8.

The SUMMIT appliance and its gas connection
must be leak tested before placing it in
operation.

9.

Purge all air from gas lines.

Caution:

Do not use open flame to check for leaks.

NOTE: The SUMMIT appliance and all other

gas appliances sharing the gas supply line must be
firing at maximum capacity to properly measure the
inlet supply pressure. The pressure can be measured at
the supply pressure port on the gas valve (Figure 20).
Low gas pressure could be an indication of an
undersized gas meter, undersized gas supply lines and/
or an obstructed gas supply line.

10.

The correct burner manifold gas pressure (offset)
is pre-set at the factory, and normally requires no
further adjustment. See Section 7.2.2.1 Offset

Figure 6. Gas Supply Piping.

Table 2. Gas Supply Piping.

Length

of

Pipe

Capacity of Pipe in MBTU/HR (.6

Specific Gravity)

¾"

1"

1¼"

10' (3m)

278

520

1,050

20' (6m)

190

350

730

30' (9m)

152

285

590

40' (12m)

130

245

500

50' (15m)

115

215

440

75' (23m)

93

175

360

100' (30m)

79

150

305

150' (46m)

64

120

250

Additional length to be

added for each tee or

bend

1.7'

(0.5m)

2.2'

(0.7m)

2.7'

(0.8m)

Advertising