Lippert Components Solera Power Awning with LED Lights OEM User Manual

Page 2

Advertising
background image

Rev: 12.23.2014

Page 2

Solera Power Awning with LED Lights Install Manual

Preparation

Note: This installation requires 3 people.

Tools Required
-

Electric screw gun

- #2 Square screwdriver bit

- 3/8” nut driver bit and/or rivet gun

Awning with LeD tube Installation

1. Insert drive head pin (Fig. 1A) into cap (Fig. 1B). Align holes and secure with waxed screw. Insert screw

fully, but do not over-tighten. Repeat process for idler head at other end.

Note: Be sure to align LED light wires (Fig. 2A) coming from idler head with the LED Light on roll tube

(Fig. 2B).

2. Connect the wires from the idler head to the wires from the LED light on the roll tube. Both sets of

wires have plastic connectors that will snap together.

Fig. 2

3. Station a person at each end of the awning assembly to hold the support arms. A third person will line

up the awning cord with the previously-installed awning rail. Slide the awning cord to desired position.

4. Set the awning assembly to the desired height and attach each awning arm assembly to the side of the

coach with four #14-10 x 1 ½" screws at the top (Fig. 3). Connect the motor to a power source, cut the

tie straps, and run the awning half way out. Remove wire cover to expose the mounting holes. Secure

the mount to the coach with four #14-10 x 1 ½" screws: two at the bottom (Fig. 4) and two in one of the

middle 3 locations (Fig. 5A).

Note: Four rivets can be used in place of the two middle and two lower screws on laminated walls.

Fig. 5

Fig. 4

Fig. 3

A

B

A

B

A

Fig. 1

Advertising