Mpg350 instructions #6, Malone – Malone MPG353 User Manual
Page 7

22
. Thread the free strap ends up and through
the buckles. Pull down to tighten. Dress
any extra strap down and around the cross
bars. See image 22.
. Finish by installing bow & stern safety
tie-downs.
MALONE
R
Installation & Loading Instructions - MPG350 Stinger
TM
MALONE AUTO RACKS, 81 County Road, Westbrook, Maine 04092
Phone: 207-774-9100 Fax: 207-615-0551
Website: www.maloneautoracks.com Email: [email protected]
Safety tie-downs are required for all transport. If you are not currently using
safety tie-downs, we strongly recommend the use of the Malone
MPG316 Sentry Ratchet Tie-Down System.
For added stability for larger kayaks, dress the straps down under the cross
bars before bringing them back up through the slots in steps 13 and 21.
Always check mounting hardware, load straps and safety tie-down lines for proper
and secure attachment before transport. Use of this product for any other
application other than kayak transport voids warranty.
Warning: All vehicular rooftop transports are potentially hazardous.
Any person using MALONE automotive transport systems is personally
responsible for following the given directions for use and installation
and accepts full and complete responsibility for any and all damages
or injury of any kind including death, which may result from their use.
IMPORTANT NOTES: