5 main lift sensor installation – NORAC UC4.5-BC-EV1 User Manual
Page 16
Advertising

13
5.5 Main Lift Sensor Installation
1. Mount the main lift sensor bracket (B11). Avoid mounting the bracket in front of or near
flat horizontal surfaces since this may reduce the sensor’s performance. Mounting as
illustrated in Figure 12 requires drilling 2 holes in the boom frame.
Figure 12: Mounting the Main-Lift Sensor Bracket on LPA2 Centerpart
Avoid mounting the main lift sensor over or near a wheel-track. Measurements
from the wheel-track do not provide an accurate crop height and will cause
measurement and control error.
Ensure the bracket does not collide with any other part of the sprayer throughout
the full range of main lift motion.
Flat Surface
Advertising