2 valve mounting – NORAC UC4+BC+AP3 User Manual

Page 22

Advertising
background image

19

4.6.2 Valve Mounting
1. Mount the NORAC valve (V01) on the

sprayer using the valve mounting
bracket (B10).

2. Screw short side of the threaded rods

into the bottom of the valve block at
least 3/8". The valve mounting holes are
drilled and tapped 3/8 NC-1" deep.

3. Tighten the Hex nuts to hold the rods.

4. Put the mounting bracket on the other

side of the tube and tighten with the
spring washers and the Hex nuts.

5. Cut excess off of the studs, if necessary.

If using bolts, the bolts should

thread into the valve block at
least 3/8". The valve mounting
holes are drilled and tapped 3/8
NC-1" deep. The rule of thumb

for bolt length is 1-1/2" longer
than the tube size.

You must ensure no hydraulic

components will interfere with
any sprayer parts or be pulled
tight at any time.

Figure 24: Valve Mounting Location

Advertising