NORAC UC4+BC+RB1 User Manual
Page 23

20
Figure 24: Valve Cable Connections
13. Connect the CAN Node cable (C02B)
to the 4-pin AMP plug on C11 (Figure
25).
14. Route the CAN Node cable (C02B) to
the roll sensors which are installed in
Section 4.5. Follow existing cables
and/or hydraulic lines.
15. Connect 4-pin AMP connectors on
C02B to the sensors.
16. Connect the sensor branch cable (C02)
to the 4-pin AMP plug on C02B
(Figure 25).
17. Route the sensor branch cable (C02) to
the wing and main sensors and connect
to the sensors. Follow existing cables
and/or hydraulic lines along the boom.
18. Cable-tie the installed cables every 12
inches.
IMPORTANT:
Provide enough slack in all cables to
account for the movement of the
main section, parallel lift, and
FOLDING boom movement.
Figure 25: Cable Configurations: C11,
C02and C02B