2 valve mounting – NORAC 4467BC+4B User Manual

Page 16

Advertising
background image

13

4.2.2 Valve Mounting
1. Remove the four 4MBP plugs from the two

station valve block. This valve block may
already be installed on the sprayer.

2. Insert the 0.047” orifice (F07A) into the “B”

port of the expansion block with the notch
facing in (Figure 14).

3. Insert the 0.042” orifice (F07B) into the “A”

port of the expansion block with the notch
facing in (Figure 14).

4. Mount the 6MB-4MOR fittings (F12) into

the “A” and “B” ports on the NORAC
expansion block.

5. Coat the four o-rings in hydraulic oil and

install them into the expansion block. Make
sure the o-rings are properly seated.

6. Attach the expansion block to the 2 station

block using the included spring washers and
bolts.

7. Tighten the bolts to 31 ft-lbs Torque.

Figure 14: Expansion Block Orifice

Orientation

Figure 15: Expansion Valve Final Assembly

8. Mount the NORAC valve on the

sprayer using the valve mounting
bracket (if not mounted already).

Figure 16: Valve Mounting Example

Advertising