NORAC UC5-BC-JD11 User Manual

Page 31

Advertising
background image



28

9. Attach hose H02 to the “B” port on the 3

rd

station of the block. Route the free end of the

hose to the John Deere valve block. Tee in H02 to the existing main lift line on the John
Deere valve block, using the tee fitting (*F03).

Figure 30: Main Lift Tee Installed

*F03

H01

Advertising