2 valve block mounting – NORAC UC5-BC-MC01 User Manual

Page 27

Advertising
background image



24

10.2 Valve Block Mounting

1. Mount the valve block to the boom.

2. Insert the threaded rod into the block and use a hex nut to hold the rod. The block holes

are 3/8” NC-1” deep. If bolts are used instead of the threaded rod, ensure the bolts thread
in at least 3/8”.

3. Use the remaining hardware to secure the block to the sprayer.

4. Cut off excess threaded rod, if necessary.

Figure 24: Valve Block Mounting

Advertising