Final inspection, Inal, Nspection – PS Engineering PMA8000MP3 Installation Manual User Manual

Page 21: 13 final inspection

Advertising
background image

PS Engineering

PMA8000B-MP3 Audio Selector Panel and Intercom System

Installation and Operator’s Manual

200-890-0600

Page 2-14

Rev. 6, Oct. 2010

2.13 Final Inspection

Verify that the wiring is bundled away from all controls and no part of the installation interferes with ai r-
craft control operation. Move all controls through their full range while examining the installation to see
that no mechanical interference exists. Verify that the cables are secured to the aircraft structure in acco r-
dance with good practices, with adequate strain relief. Ensure that there are no kinks or sharp bends in the
cables and coaxial cables. Verify that the cables are not exposed to any sharp edges or rough surfaces, and
that all contact points are protected from abrasion.

Complete documentation that may be required, such as a logbook entry, weight and ba lance computation
and FAA Form 337. Sample text for FAA Form 337, and instructions for continuing airworthiness can be
found in Appendix F. Return completed warranty registration application to PS Engineering, or co mplete
online at www.ps-engineering.com.

Advertising