Installation instructions, Wa ll f – Santec 708420 User Manual
Page 3
Advertising

INSTALLATION INSTRUCTIONS
PAGE 03
708420_ _
2.
- Once it fixed and aligned properly then
screw in two machine screws on the top
of the cylindrical holders.
- They will tighten in the pedestal of the cylindrical
holder which were screwed in the wall at the start.
- Tighten them firmly.
- Now put the base cover caps on the threaded
projection of the base body.
- Put on the spray assembly in the slotted groove
as shown int he figure.
When screw is threaded in,
put on the cap on the threads
on the post
.
Water Inlet
W
a
ll
f
2.2”
27”
f
0.7”
Wider end
up
Narrower end
Down
To position hand held shower properly
in the holder bracket, bracket orientation
has to be the same as shown in the figure.
Advertising