Solberg BBF Assembly User Manual

Page 4

Advertising
background image

4

“BBF” Series Blower Base Frame Assembly Instructions Rev.: 9105

SOLBERG




Customer or Solberg Supplied Parts (Boot Kits available separately upon request)

(1) Rubber sleeve/boot

(2) Band clamps

Helpful Tools:

-

Pipe

wrench

- Allen wrench set

- 3/4" Combination wrench

- Screwdriver (for band clamps)

- Compact bolt/wire cutter

- Tension measuring tool

-

Straight

edge

-

Lifting

hoist

- 3/8” Socket wrench

-

Soft

mallet

-

Tape

measure

- Torque wrench (w/ sockets)

-

Crescent

wrench





Solberg’s BBF Series, Blower Base Frame Assembly Instructions

1.1 Materials Needed (MN):

- (1) Solberg blower base frame
- (2) Standard channels
- (4) ½”-13 x 1-1/2” carriage bolts
- (4) ½”-13 “Whiz” flange nuts

1.2

If a relief valve is required, install into the relief port prior to affixing
the blower.

1.3 The frame is supplied with rails in place; slightly loosen rails for

necessary adjustments.

1.4 If frame needs rails installed, place (2) standard channels on top of

frame, the channels will overhang the frame on the right hand side.
Place (4) carriage bolts through square holes and thread on nuts
but do not tighten; rails need to be able to slide in frame slots.



2.1 MN - (1) Flex Coupling

- (2) Band Clamps
- (4) ½”-13 x 1-1/2” carriage bolts

2.2

Slide flex coupling over the OD of the BBF inlet pipe stub. Slide
band clamps over the OD of the flex coupling. Slide (4) carriage
bolts, (2) into each channel with the threaded portion protruding up
through the channel. These are for mounting the blower to the
channels.





Figure 1.2

Figure 2.2

Relief Valve

Advertising