Chapter 2 - setup, Power up sequence – TeeJet CenterLine 230BP User Manual

Page 8

Advertising
background image

CenterLine 230BP

98-05112 R4

7

ChapTer 2 - seTup

The CenterLine 230BP is configured to work with Auto-

matic Boom Section Control (ABSC) through the use of

a SmartCable or Section Driver Module (SDM). It is also

configured to work with Assisted Steering through the use

of a Steering Control Module (SCM). A Tilt Gyro Module

is available as a standard feature when a SCM is in use.

It is also able to be used as an add-on feature if no SCM

is present.

Setup Flow Overview:

power up sequence

Before starting the CL230BP, make sure the spray control-

ler is powered up, the Master Switch is set to the “On” posi-

tion, and the individual boom section switches are turned

“Off”.

NOTE: For information regarding the use of

FieldPilot 230, refer to document

# 98-05137 R0.

Power up the system by pressing the Power button.

Power down the system by pressing and holding the Pow-

er button for approximately four (4) seconds. At power

up, the CL230BP will perform the following steps:

Display copyright and software version screen for

•

three (3) seconds.

Display the splash screen for two (2) seconds.

•

Detect if GPS data are present (this occurs simulta-

•

neously within the display screen sequence).

Display the current swath width for three (3) sec-

•

onds.

The Area Reset screen will be displayed.

•

The splash screen is displayed until the (D)GPS LED

•

is illuminated or Setup mode is entered. Once the

console begins receiving (D)GPS positions, the Op-

eration screen will be displayed.

29.

Swath Width

Screen

5

Displayed while

waiting for

(D)GPS

6.0 MPH

GPS detected

Operation

Screen

+0

Area Reset

Screen

Bp

teeJet

© 2008

Copyright

Software

Version Screen

CL230

V1.07

Setup

(standard)

Assisted

Steering

(if present)

Tilt

(if present)

Display

Setup

(standard)

Splash

Screen

Advertising