Fieldpilot, C2 c1 v1 v2, Qc, e, k, n – TeeJet FieldPilot Install Spra Coupe 44XX 4-Wheel User Manual

Page 11: Qc, e, k, n cc

Advertising
background image

www.teejet.com

10

FieldPilot

®

1A. PREPARE THE COUNTERBALANCE VALVE

Make sure the counterbalance valve block is clean and free of dust. Remove the plastic plugs and install

adapters

(CC)

in the four ports (V2, V1, C2, C1). Install adapter

(BB)

on the fitting in port V2.

Figure 1-3: Preparing the Counterbalance Valve

BB

C2 C1

V1

V2

2. INSTALL MOUNTING BRACKETS FOR FIELDPILOT VALVE.

On the front of the machine, remove the bolt that holds the bracket and the steering hoses on the front cross

beam. Using parts

(C, E, K, N)

, mount the bracket

(Q)

on the cross beam.

Figure 1-4: Install Mounting Brackets for Hydraulic Control Valve

Q

C, E,

K, N

Q

C, E,

K, N

CC

Advertising