Vertical kayak rack – Tie Down Vertical Kayak Rack User Manual

Page 2

Advertising
background image

TIE DOWN ENGINEERING • 255 Villanova Drive SW • Atlanta, GA 30336

www.tiedown.com (404) 344-0000 Fax (404) 349-0401

020113,A1300

Vertical Kayak Rack

GalvX #86904 / Galvanized #86922

Eye bolts secure the receiver

to the kayak rack base.

Once the holes are aliened

hand tighten all eye bolts.

1

1

2

4

3

3

7

4

5

6

Assembly Instructions:

1. Using 2 - 1/4"x 0.5" pan head screws (5) and
2 - 1/4" acorn nuts (7) attach bracket pads (3) to
bottom of Kayak brackets (2). Repeat for remaining
kayak brackets.

2. Slide 2 - 1/4"x 2.75" pan head screws (4) through
bracket pads (3) and then through back of Kayak
brackets (1), then secure brackets to support tube
stand using 2 - 1/4" nyloc nuts (6). Repeat for

remaining kayak brackets.

7

2

4

3

3

4

5

6

8

Installation Instructions:

1. Slide base of accessory tube into receiver until
threaded holes align with holes in receiver.

2. Slide eye bolts through receiver side holes and screw
into threaded holes in accessory base. Hand tighten all
eye bolts and then use screw driver shaft to tighten
one half turn.

3 Secure kayaks to rack using 4 - 3' cam straps (9).

Advertising