Tie Down Xi2 Foundation System User Manual

Page 2

Advertising
background image

Xi2 Lateral Stabilization

Single Section Home
0 - 76’ Box 2 Xi2 Systems
Over 76’ Box 3 Xi2 Systems

Single Section Home
0 - 64’ Box 2 Xi2 Systems
Over 64’ Box 3 Xi2 Systems

Double Section Home
0 - 76’ Box 2 Xi2 Systems
Over 76’ Box 3 Xi2 Systems

Double Section Home
0 - 64’ Box 2 Xi2 Systems
Over 64’ Box 3 Xi2 Systems

Triple Section Home
0 - 76’ Box 2 Xi2 Systems
Over 76’ Box 3 Xi2 Systems

Triple Section Home
0 - 64’ Box 2 Xi2 Systems
Over 64’ Box 3 Xi2 Systems

Xi

System

24'

28'

32'

32' 49' 65' 82' --

30' 46' 62' 76' 80'

-- 44' 58' 73' 80'

2

3

4

5

6

wide

wide

wide

(1)

(1)

(1)

Xi2 Pier

Placement

Xi

System

24'

28'

32'

32' 49' 65' 82' --

30' 46' 62' 76' 80'

-- 44' 58' 73' 80'

2

3

4

5

6

wide

wide

wide

(1)

(1)

(1)

3rd System

for Placement

* For Wind Zone I - approved uplift anchor and strap from 45 to 90 degrees, within 10’ of end of home on single sections.

NOTE: Diagram represents single section up to 16’ width, double section up to 32’ width, and triple section homes up to 48’ width.

For additional systems see the last page.

Approved Anchor*

with strap from

45 to 90 degrees

Wind Zones

I & II

Wind Zones

III

101613,D975

Installation of Lateral System

1. Identify the number of systems to be used on the home using the chart above.
2. Identify the location where the lateral systems will be installed.
3. Clear all organic matter and debris from the pad site. Approx. 2” below grade or frost line.
4. Place u-bolt though holes provided. Attach lock washers on u-bolt, on the top side of pad. If installing lateral

and longitudinal together, install u-bolt for longitudinal in pad during this step.

5. Place pad centered under beam with the lateral strut bracket towards the inside of the home.
6. Press or drive pad into ground until top is level and flush with prepared surface.
7. Build pier according to State, Local or Home Manufacturers guidelines.(Figure 1)
8. Attach the end of the smaller tube to the inside of pad using U-bolt & nuts provided
9. Attach the flag end of the larger tube to the opposite I-beam using the “J” bolt over the top of the I-beam

with the nut & washer provided. (Figure 2)

10. Install a minimum of four (#14 x 1” tek screws) self-tapping screws into the holes provided in the lateral strut so

that the two tubes are connected together with a minimum overlap of 4” to 6” (Figure 1).

4 - #14 x 1”

Tek Screws

2 per side

Ground Pad

Stamped

Part #59305

Figure 1

Figure 2

Advertising