Tii 122H/122H-1 User Manual

Page 2

Advertising
background image

1. Terminate the Telco Side cable (i.e., aerial or

buried drop) in between the bottom set of
washers and bottom nut of the appropriate
stud (one conductor to Tip and one to Ring).
Tighten down the nut (Figure 2).

2. Terminate the Customer Side cable under the

top set of washers and the top nut of the
appropriate stud (one conductor to Tip and
one to Ring). Tighten down the nut (Figure 2).

3. Loop back unused station wire conductors and

coil around the station wire jacket or store in
such a manner as to prevent them from
coming in contact with protector terminals or
bare wires.

4. When more than one cable is placed under a

nut, use washers between the wires.

5. Use caution when terminating small gauge

Customer Side cable on the protector module
terminals, as the wires may catch in the
threads of the terminal and be cut or broken
when nuts are tightened.

6. Check all nuts to make sure they are tight.

Note (Caution/Important)

1. When clearing trouble on a line that contains

gas tube protector modules, and when the test
board has indicated that there may still be a
power contact, inspect the non-cable portion
of the line from the ground for any power
contacts or evidence of damage from power
contacts.

2. Special care should be taken in making the

inspections where the line runs through trees
or where visibility is limited.

3. If a power contact is found, notify the proper

authority so it may be corrected.

4. Do not work on the line until the power contact

has been cleared.

5. If no contact is found but the test board still

have indications of a power contact, wear
insulating gloves while working with the test
board to clear the line.

Telco Side Cable 

Terminate Between

 

Washers

 

Figure 2

Ground Clip 

Customer Side Cable

Terminate Between

 

Washers 

!

Advertising
This manual is related to the following products: