Toa VS-900 User Manual
Page 16
Advertising
16
10.2. PU-200 Power Transformer Unit
10.2.1. Rack mounting
Step 1. Remove the 4 mounting screws, and attach the supplied wall mounting brackets to the transformer
unit using the removed screws.
Mounting screw
Wall mounting bracket (accessory)
Step 2. Attach the PU-200 to the PN-100B Rack Mount Panel.
PN-100B
PU-200
Machine screw M3 x 8
(supplied with the PN-100B)
Flange nut M3
(supplied with the PN-100B)
Step 3. Mount the PN-100B in an equipment rack.
Binding head self tapping screw 5 x 12
(supplied with the PN-100B)
Fiber washer
(supplied with the PN-100B)
Note
Perform terminal wiring before mounting.
Advertising