Winco ul ats – Winco PSS12/A User Manual
Page 17
Advertising

PAGE 15
0306-01
60706-147
CUSTOMER DC CONNECTION POINT
WINCO UL ATS
Complete installation instructions for WINCO UL Automatic Transfer Switches are contained in
the operator manual with each switch. Read the complete instructions before installing.
All control wires (18-12 AWG) must be torqued to 19 in-lbs.
ULATS100-3 120/240 1 Phase
ULATS100-17 120/240 3 Phase
ULATS100-4 120/208 3 Phase
ULATS200-3 120/240 1 Phase
ULATS200-17 120/240 3 Phase
ULATS200-4 120/208 3 Phase
Advertising