The outer diameter of the threaded end is 15/16".

A

DANGER

Although you may choose to perforrh
electrical connections yourse^^^
CARRIER recommends that a

licensed electrician or individual with complete
knowledge of electricity perform the procedures
in sections 12.13a. and 13b.

A

DANGER

Switch service main circuit breaker
to off" or open posifion prior to
removal of cover or removal of any

wiring of fhe main electrical distribution panel.
The wires connected to
the service main circuit

breaker

remain

live

or

‘ hot". Avoid contact with

these

wires

and

the

service main circuit breaker connection lugs.

I I I I I I

STEP 3

CONNECTION TO EXTERNAL CONNECTION BOX

10a. Determine where the flexible conduit will pass through the house from inside to outside.

When you are certain you have clearance on each side and within the wall, drill a small pilot

hole through the wall to mark the location.

10b. Using a hole saw, drill a 1-3/4 inch diameter hole in the house’s wall to allow the conduit

to fit through.

11a. From the inside of the house, feed the end of the 30-foot conduit (which is pre-wired from

transfer switch) through the wall to outside.

lib. Remove the threaded lock nut from the conduit coupling.

-

M

MiSi

11c. Lift cover. Remove internal oover plate screw and internal cover.

Remove the knock out in the lower right corner of the external

connection box. From the rear of the connection box, feed wires

& 4 pin plug into box. Slip the lock nut over wires and plug and

tighten securely onto conduit coupling. Using appropriate

Ground

fasteners, mount external connection box over pre-drilled hole to

Screw

fully conceal the hole. Seal around the hole and conduit with

silicone caulk from both the inside and outside of the home.

Knockout

Also, caulk around the sides and top of the box to seal the edges to the siding or wall.

Connect wires to lugs; Black to black, white to white, and red to red. Torque nuts to 20

in/lbs. Snap together the 4-pin plug connector. Loosen nut from grounding lug and attach

ground wire (green) from conduit. Reinstall nut and tighten to 45 in/lbs. Reinstall internal

cover plate and screw. Close cover and install lock. This wiring is complete.

The external connection box must be locked to

ensure safety and to discourage tampering.

STEP 4

MOUNTING THE AUTOMATIC TRANSFER SWITCH

12.

Locate

automatic

transfer

switch

with

built-in

emergency

load

main

distribution

panel.

The

automatic

transfer switch with built-in load center can

be located to the left or right of main

distribution

panel.

Hold

transfer

switch

against

the

mounting

surface.

Level

the

transfer

switch

and

mark

the

mounting

holes. Drill the appropriate size pilot holes.

Mount

automatic

transfer

switch

with

built-

in

load

center

to

mounting

surface

with

appropriate fasteners.

center within one foot of

NOTE: Balance must be maintained when moving
circuit

locations

from

main

electrical

distribution panel to emergency load center.
Circuit breaker positions alternate buss bars
vertically. Circuits sharing a neutral wire should
either be moved together to adjacent positions in
emergency load center or not moved. If you are
unsure of proper procedure or if your installation
differs from that described in this guide, consult
a licensed professional at this time.

STEPS

CONNECTION OF EMERGENCY CIRCUITS

13a.

Remove

the

main

electrical

distribution

panel

cover.

Remove

appropriate size knockout from the bottom or side of the main panel.

(A 2-foot flexible conduit is pre-wired from the transfer switch with

built-in

load

center.)

Remove

threaded

lock

nut

from

conduit

coupling. Feed all wires through knockout into main panel. Slip lock

nut over wires and tighten securely on conduit coupling. Remove the

black (hot) wire from a circuit breaker that protects a circuit you

want to have powered in the event of a power failure. -