Condensate drain, Air quantity – Carrier 28GH User Manual

Page 2

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

COIL 006 must have the liquid and suction lines
soldered to the unit.

Refrigerant Control

is a factory-installed thermal

expansion valve. For proper operation, locate the
feeler bulb outside the encased coil about 45
degrees above the horizontal center line of the
suction line.

Do not mount bulb such that capillary tube

extends from bottom of bulb. Clean suction line
for good contact with bulb. Secure bulb tightly to
suction Une with metal straps provided. If this is
not done, liquid may slug to the compressor.

Suction Line Insulation

— Insulate entire suction

line. Tubing package has an insulated suction line.

Insulate suction line from encased coil to, and

surrounding, expansion valve feeler bulb on 28GH
Coils.

Refrigerant Charge

— Coils 002 thru 005 have

vapor holding charge. Do not evacuate if accessory

tubing package with Carrier Compatible Fittings is
used. If sweat connections are used, purge or
evacuate coil and piping.

Coil 006 is shipped without charge. Purge or

evacuate coil and piping.

Refer to Standard Service Techniques Manual,

Chapter 1, pages 1-8 thru 1-14, and condensing
unit and/or tubing package instructions for details.

Condensate Drain

1. Connect the rubber elbow (furnished with unit)

to the primary drain. See Fig. 1.

2. Connect 7/8-in. copper tube to the elbow.
3. Form a trap in the 7/8-in. copper tube and run

the tubing to an open drain. Drain tube should
be pitched at least 1 in. per 10 ft.

4. Run individual condensate lines to the primary

and secondary drain pans. The condensate line
should discharge at a point where it can be
readily observed if a correction is needed.

HOW TO APPLY HOSE CLAMPS

1. Pull ends apart (Fig. 3).

2. Wrap around hose with toothed end beneath.

Prelatch by compressing until last ratchet teeth
catch behind small tabs.

LOCKiNG

COIL 28GH

002

003

004

005

Horizontal

975

1200

1580

1920

CLAMP IN LOCKING POSiTiON

Fig. 3 — Hose Clamp

3. Grip adjacent bridges with pliers and compress

to tight position. Pliers can be held parallel to
hose where space is limited.

4.

To remove, lift the locking tongue with

screwdriver.

Protective Plastic Film

— Peel from unit panels

when installation is complete.

AIR QUANTITY

To prevent moisture blowoff do not exceed

cfm shown in Table 1.

Table 1 — Maximum Allowable CFM for 28GH Coil

006

2560

Manufacturer reserves the right to change any product specifications without notice.

C A R R I E R A I R C O N D I T I O N I N G C O M P A N Y • S Y R A C U S E , N E W Y O R K

Tab 7

Form28GH-1SI New

Printed in U.S.A.

6-69

Codes D and MS

Catalog No. 532-841