k m

6. Insert the smallest flue conneetion pipe at the

highest level consistent with available head-
room or clearance to combustible materials,
when 2 or more vent connectors enter a com­
mon gas vent or chimney flue.

7. Extend flue connection pipe thru chimney wall,

flush with inner face of chimney liner and above
extreme bottom to avoid restriction.

WARNING; Never connect into a chimney
serving an open fireplace unless fireplace
opening is sealed off.

8

.

9.

10

.

No portion of the venting system shall extend
into or pass thru any circulating air duct or
plenum.

Chimney or gas vent should extend at least 5 ft
above highest connected draft hood and should
extend high enough above roof of any neighbor­
ing obstruction so that wind from any direction

will not create positive pressure in vicinity of a
chimney or gas vent outlet. Chimney or gas vent
should extend 3 ft higher than point of emer­
gence thru roof, and at least 2 ft higher than any

object within radius of 10 feet. See Fig. 4.

A type-Bl gas vent shall terminate above the
roof surface with a listed cap or roof assembly.

Tn

3 MIN GAS VENT
OR CHIMNEY

HEIGHT ABOVE ANY
ROOF SURFACE
WITHIN 10'
HORIZONTALLY

3MIN GAS VENT

OR CHIMNEY

Fig. 4 — Chimney, Gas Vent Height

ELECTRICAL

IMPORTANT: Before proceeding with the

electrical

connections,

make

certain

that

voltage, frequency, and phase correspond tp
that specified on the furnace rating plate. Also,
check to be sure that the service provided by the
utility is sufficient to handle the additional load
imposed by this equipment. Refer to the unit
rating

plate

for

equipment

electrical

requirements.

" The specific furnace installation instructions con­

tain wiring diagrams that show the proper field high-
and low-voltage wiring. Make all connections in
accordance with the National Electrical Code and
any local codes or ordinances that might apply.

^ W.ARNING: The cabinet must have an unin-

terruoted or unbroken ground according to
National

Electrical

Code,

ANSI/NFPA

70-1981, ANSI C1-19SI, or local codes to mini­

mize personal injury if an electrical fault should
occur. This may consist of electrical wire or
conduit approved for electrical ground when
installed in accordance with existing electrical
codes. Do not use gas piping as an electrical
ground.

CAUTION; If manual disconnect switch is to be
mounted on the furnace, select a location where
drill or fastener will not contact electrical or
gas components.

NOTE; Use only copper wire between disconnect
switch and furnace. If aluminum wire is used be­
tween service panel and disconnect switch, adhere

to the following recommendations.

When making aluminum conductor connections

to copper conductors or terminals, use only con­
nectors that are UL approved (marked Al/Cu with

the UL symbol) for the application and wire size.
Do not reduce wire size to fit connector by cutting
off strands. Use properly sized connectors.

After insulation has been stripped from the

aluminum conductor, coat the conductor end with
corrosion inhibitor (Burndy Pentrox A or equiv­
alent), and wire-brush the aluminum surface thru

the inhibitor.

CAUTION: Do not wire-brush connectors and
lugs. The plating will be broken.

After cleaning, recoat the aluminum conductor

with inhibitor, and make connection, then coat entire
connection. When it is suspected that the connection
will be exposed to moisture, it is very important to
cover the entire connection completely to prevent
an electrochemical action that will cause the con­
nection to fail very quickly.

If aluminum conductors are to be used, the wire

size selected must have a current capacity not less
than that of the copper wire specified, and must not
create a voltage drop between the service panel
and the furnace in excess of 2% of the unit rated
voltage.

Check all electrical connections (both factory and

field) for tightness. This should also be done after
the unit has reached operating temperatures,
especially if aluminum conductors are used.

START-UP, ADJUSTMENT, AND

SAFETY CHECK

Pilot

— Check to be sure that all connections have

been properly made, then proceed as follows;

Light the pilot, using the procedure outlined on

the Lighting Instruction Plate attached to the fur-

Advertising