5) hang the opener, Warning, Installation step 5 – Chamberlain 1200 User Manual

Page 17: Hang the opener, Figure 1 figure 2

Advertising
background image

Installation Step 5

Hang the Opener

Two representative installations are shown.
Yours may be different.
Hanging brackets should
be angled, Figure 1, to provide rigid support. On
finished ceilings, Figure 2, attach a sturdy metal
bracket to structural supports before installing the
opener. The bracket and fastening hardware are not
supplied.

• Measure the distance from

each side of the opener

to the structural support.

• Cut both pieces of the hanging bracket to required

lengths.

• Drill 3/16" pilot holes in the structural supports.

• Attach one end of each bracket to a support with

5/16"x1-7/8" lag screws.

• Fasten the opener to the hanging brackets with

5/16"-18x7/8" hex screws, lock washers and nuts.

• Check to make sure the T-rail is centered over the

door (or in line with the header bracket if the
bracket is not centered above the door).

• Remove the 2x4. Operate the door manually. If the

door hits the rail, raise the header bracket.

Measure
Distance

Lag Screws

5/16"x1-7/8"

Structural

Supports

5/16"-18x7/8" Screw

5/16" Lock Washer

5/16"-18 Nut

Bracket

(Not Supplied)

Lag Screws

5/16"x1-7/8"

(Not Supplied)

5/16"-18x7/8" Screw

5/16" Lock Washer

5/16"-18 Nut

— FINISHED CEILING —

5/16"-18x7/8" Screw

5/16" Lock Washer

5/16"-18 Nut

Hidden

Support

17

The opener could fall and injure someone if it is
not properly secured. Fasten the opener
securely to structural supports of the garage.

Lag Screw

5/16"-18x1-7/8"

Hex Screw

5/16"- 18x7/8"

Nut 5/16"-18

Lock Washer 5/16"

Hardware Shown Actual Size

WARNING

Figure 1

Figure 2

RAIL GREASE

NO. 83A4

Rail Grease

Grease the top and underside of the rail
surface where the trolley slides. A tube of
grease is supplied.

Advertising