Tools needed, Unpacking, Assembly – Sears 583.35683 User Manual

Page 5

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

UNPACKING

ASSEMBLY

(For 110,000 Btu/Hr

Model Only)

1. Remove all paeking items applied to heater for shipment.

2. Remove all items from earton.
3. Cheek items for shipping damage. If heater is damaged, promptly inform dealer

where you bought heater.

This model is furnished with wheels and a handle. Wheels, handle, and the
mounting hardware are found in the shipping earton.

Tools Needed

• Medium Phillips Screwdriver
• 3/8" Open or Adjustable Wrench
• Hammer

1

.

2

.

3.

4.
5.

6

.

7.

Slide axle through wheel support frame. Install wheels on axle.

IMPORTANT: When installing wheels, point extended hub of wheels toward

wheel support frame (see Figure 3).
Place cap nuts on axle ends. Gently tap with hammer to secure.
Place heater on wheel support frame. Make sure hot air outlet end (front) of
heater is over wheels. Line up holes on fuel tank flange with holes on wheel
support frame.
Place plastic tube caps onto open ends of handle.
Place handle on top of fuel tank flange. Make sure handle is over air inlet end
(rear) of heater. Insert four screws through handle, fuel tank flange, and wheel
support frame. Attach nut finger tight after each screw is inserted.
Insert remaining four screws through tank flange and wheel support frame.
Attach nut finger tight after each screw is inserted.
After all screws are inserted, tighten nuts firmly.

Figure 3 - Wheel and Handle Assembly, 110,000 Btu/Hr Model Only

Advertising
This manual is related to the following products: