Assembly, Y checklist – Sears 917.251551 User Manual

Page 10

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

ASSEMBLY

y CHECKLIST

BEFO RE YO U O PERATE AND ENJO Y YO UR NEW

TRA CTO R, W E W ISH TO ASSURE THA TYO U RECEIVE
THE BEST PERFO RM ANCE AND SA TISFACTIO N FRO M

THIS Q UALITY PRO DUCT.

PLEASE REVIEW THE FO LLO W ING CHECKLIST:

/ All assembly instructions have been completed,

/ No remaining loose parts in carton.

/ Battery is properly prepared and charged. (Minimum

1 hour at 6 amps).

/ Seat is adjusted comfortably and tightened securely.

/ All tires are properly inflated. (For shipping purposes,

the tires were overinflated at the factory).

/ Be sure mower deck is properly leveled side-to-side/

front-to-rear for best cutting results. (Tires must be

properly inflated for leveling).

/ Check mower and drive belts. Be sure they are routed

properly around pulleys and inside all belt keepers.

/ Check wiring. See that all connections are still secure

and wires are properly clamped.

W HILE LEARNING HO W TO USE YO UR TRACTO R,
PA YEXTRA A TTENTIO N TO THE FO LLO W ING IM PO R­

TANT ITEM S:

/ Engine oil is at proper level.

/ Fuel tank is filled with fresh, clean, regular unleaded

gasoline.

/ Become familiar with ail controls - their location and

function. Operate them before you start the engine.

/ Be sure brake system is in safe operating condition.

10

Advertising