Hardware kits, Hardware, Assembly hardware – Chamberlain SECURITY 4620 User Manual

Page 5: Installation hardware

Advertising
background image

Hardware

5

Separate all hardware from the packages in the rail carton and the opener carton and group as shown below, for
the assembly and installation procedures.

Lock Nut

1/4"-20 x 7/16 (12)

Wing Nut (2)

Carriage Bolt

1/4"-20x1/2" (2)

1/4" - 20 x 5/8"

Hex Screw (4)

Sprocket Coupling Sleeve

Assembly Hardware

Bolt

1/4-20x1-3/4" (8)

Installation Hardware

NOTICE

Handle

Nut 5/16"-18 (6)

Ring

Fastener (3)

Clevis Pin

5/16"x2-3/4" (1)

Insulated

Staples (30)

Dry Wall Anchors (2)

Clevis Pin

5/16"x1" (1)

Rope

Carriage Bolt

5/16"-18x2-1/2" (2)

Lock Washer 5/16" (6)

Lag Screw

5/16"-9x1-5/8" (2)

Hex Screw

5/16"-18x7/8" (4)

Clevis Pin

5/16"x1-1/4" (1)

Lag Screw

5/16"-18x1-7/8" (2)

Advertising
This manual is related to the following products: