Attaching the catcher bag, Operation, Gas and oil fill up – MTD 24650-9 User Manual

Page 6: To start engine, Note

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

ATTACHING THE CATCHER BAG

Your

unit

is

equipped

with

a

nylon

bag

which

attaches

to

the

discharge

opening.

If

desired,

place

the

end

of

the

bag

over

the

chute

deflector.

Depress

plunger,

pull

on

the

drawstring,

and

release

plunger

to

lock

it

in

• position. See figure 6.

OPERATION

GAS AND OIL FILL UP

NOTE

ENGINE

IS

SHIPPED

WITHOUT

OIL.

FILL

CRANKCASE

WITH

OIL

BEFORE

STAR­

TING.

Service

engine

with

gasoline

and

oil

as

instruc

ed

in

the

separate

engine

manual

packed

with

your

shred­

der. Read instructions carefully.

TO START ENGINE

1.

Attach spark plug wire to spark plug.

2.

Place choke lever on engine in CHOKE pos tion.

See figure 7 or 7A.

NOTE

A

warm

engine

may

not

require

choking.

3.

Place the throttle control lever on engine in 7\ST

position.

Throttle Control

Lever in Start

Position

Choke

Lever

Tecumseh Engine

5.

6

.

7.

FIGURE 7. - Briggs and Stratton Engine

Grasp

starter

handle

(see

figure

8)

and

pull

rope

out

slowly

until

engine

reaches

start

of

compres­

sion

cycle

(rope

will

pull

slightly

harder

at

this

point). Let the rope rewind slowly.

NOTE

A

noise

will

be

heard

when

finding

the

start

of

the

compression

cycle.

This

noise

is

caused

by

the

flails

and

fingers

which

are

part

of

the

shredding

mechanism

falling

into

place,

and

should be expected.

Pull

rope

with

a

rapid,

continuous,

full

arm

stroke.

Keep

a

firm

grip

on

start

handle.

Let

rope

rewind

slowly.

Do

not

let

starter

handle

snap

back

against starter.

Repeat

preceding

instructions

4

and

5

until

engine fires.

After

engine

starts,

move

throttle

control

lever

on

engine

to

slow

position

for

a

few

minutes

warm

up.

Move

choke

lever

gradually

to

RUN

position.

Then

move

throttle

control

lever

to

FAST

posi­

tion for shredding operations.

Advertising