Screen setup - touch screen calibration – Dual XDVD8183 User Manual

Page 29

Advertising
background image

XDVD8183

OPERATION

8

XDVD8183

OPERATION

SCREEN Setup - Touch Screen Calibration

Upon initial installation or

occasionally, the touch screen may

have to be calibrated. Follow these

steps as described.

Step 1

Step 2

Step 3 & 4

Step 5 & 6

1) Touch top left corner of screen.

) Touch SCREEN icon.

3) Touch No in TS Calibration row.
4) Then touch Yes.

5) Touch and hold the pointers as indicated on the screen for  seconds each.
6) Screen will automatically return to MAIN MENU, touch EXIT to return.

L

L

1



Note: For proper calibration
you must touch each pointer for
2 seconds. If pointers are not
touched properly, the calibration
sequence will start over until the
calibration is done correctly.

L

L

3

4

L

5

Advertising