Operation instructions, Zzo^n – NewAir ACP-1000E User Manual

Page 8

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

3. Operation instructions

Air Exhaust Hose

The hot air exhaust conducts the hot, moist air produced by the air conditioner

away from the space that you are trying to cool. The window kit and exhaust
hose can be moved along with the air conditioner from room to room.

1 .Exhaust the hot air through a window or sliding glass door (window kit

extension may be necessary)

Open a window or sliding glass door. Install the window kit. then connect the
exhaust hose.

2.Exhaust the hot air through a custom opening through the wall or ceiling

A custom opening can be cut in order to facilitate the exhaust hose if an

existing window or sliding glass door cannot be used.

Note:
The hot air must be exhausted for this air conditioner to provide a cooling effect.
When the air conditioner is not in use, please store the exhaust hose safely.

1 3

3. Operation instructions

Exhaust Hose

1 .The exhaust hose can extend

from 1.8 feet to 6.5 feet. The
shorter the hose is, the better
the cooling effect will be.

3.The length of the exhaust hose

should not be extended beyond
6.5feet. Replacement hoses
are available for purchase
through the vendor, we recom­

mend that you use only New Air
replacement parts.

2.The hose should be as straight

as possible, as sharp or unnec­
essary bends in the hose will

prevent effective air flow result-
ingin overheating and possible

shut-down of the air conditioner.

■ZZO^n]

n)

c

ro

1 4

TJ

GO

Advertising