A, a – Associated Equipment 3HP User Manual

Page 2

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Operating Instructions and Parts Manual

Assembly

'A, A

and

%

Models (See Figure 1, Page 4}

1, Assembly includes the installation of the air baffle, sealing

gasket, discharge bag elbow, dust bag, hose and nozzle,

2, To install the air baffle and sealing gasket, place the unit

upside down on a cardboard covered flat area,

a. Attach the air baffle (13) as shown using included bolts,

b. Remove the paper protection from the sticky side of the

gasket (12) and install on the underside of drum lid/guard
assembly (11), Surface should be clean and dry before

application,

3, Attach bag elbow, filter bag, hose and nozzle,

a. Place the unit right-side up on your container and attach

the discharge bag elbow (4) on the discharge of the

blower as shown in the illustration. Insert and tighten the
included sheet metal screws,

b. Clamp the dust bag (9) on the other end of the elbow

using the clamp enclosed (6),

c. Mount sheet metal reducing adapter (10) to the inlet on

top of drum lid/guard assembly using the squeeze iug to

secure, (li HP Model only),

d. Clamp suction hose (7) to reducing adapter or inlet with

adjustable clamp (8) provided.

e. Clamp nozzle (14) to suction hose with clamp (8),

1, lii, 2 and 3HP Models (See Figure 2, Page 5)

1. Assembly includes the installation of the intake cylinder,

deflector elbow, sealing gasket, discharge bag elbow, dust
bag, hose and nozzle.

2. To install the intake cylinder, deflector elbow and sealing

gasket, place the unit upside down on a cardboard covered

flat area.

a. The deflector elbow (9B) is attached as shown by

removing the two nuts installed at the factory.

b. The intake cylinder (13) is attached as shown using

1/4-20 bolts supplied.

c. Remove the paper protection from the sticky side of the

sealing gasket (11) and install on the underside of the
drum lid (10).

3. Attach bag elbow, filter bag, hose and nozzle (except

3HP Model)*.

a. Place the unit right-side-up on your container and attach

the discharge bag elbow (3A) on the discharge of the
blower as shown in the illustration, insert and tighten the
included sheet metal screws.

b. The dust bag is attached to the removable elbow sleeve

(3C). (This sleeve slips over the end of the elbow and is
held in place with snap-latches.) Clamp the dust bag (8)

to the sleeve (3C) using the clamp (14) enclosed.

IMPORTANT!

The edge of the dust bag should be

approximately 1/4" below the flange on fhe sleeve so that

the snap-latches can close completely. If the fabric is too

close to the flange, the snap-latch will rest on the fabric,
and not fully retain the dust bag.

Slip the 6" diameter 0-ring (3B) over the end of the
elbow (ЗА) and seat against the retaining rib. With snap-
latches in a raised position, slide the sleeve (3C) with
attached bag onto the end of the elbow with a slight

twisting motion until tight against the O-ring. Snap the

latches down. (To remove the dust bag for emptying,
snap up the latches and remove the sleeve; reinstall as
above).

c. Mount the sheet metal reducing adapter (7) on the inlet

elbow (9A) using the squeeze lug to secure.

(1HP Model only).

d. Clamp the suction hose (5) to the reducing adapter or

inlet elbow using the adjustable clamp (6) provided.

e. Clamp nozzle (12) to suction hose with damp (6).

Installation

Place the assembled dust collector on the correct diameter

drum (not included).

Plastic containers should not be used

as they cannot support the weight of the collector.

Place V

j

, 'A, and % HP Models on a container having a diameter

of 191i"-20!i".This includes 30-gallon galvanized garbage

cans, or 30-35 gallon open top steel or fiber drums. Do not use

plastic drums.

Place 1, Ti, 2 and 3 HP Models on a container having a

diameter range of 23'-24", such as a standard 55-gallon steel
or fiber drum. Do not use plastic drums.

Check motor rotation on 3-phase power connections; the
cooling fan on the motor should turn clockwise as observed

from above. An electrician can correct rotation by

interchanging any two (3-phase) power lead wires.

Operation

Attach the dust collector inlet hose directly to the connector
built into the dust producing tool. If no built-in connector,
position a hose-end mounted nozzle where it will collect the
dust.

NOTE:

Check the recommendation of the tool

manufacturer for the required CFM air flow. The CPM listed in

the specifications for your collector should be greater than the

required CFM to ensure dust collection. See page 7.

Empty the dust collection drum when it becomes half full; if too

full, all dust will be carried into the dust bag.

* See page 6 for filter bag attachment for 3HP Model,

Advertising
This manual is related to the following products:

2HP