Operation, Assembly, Continued – Desa 28BN User Manual

Page 6

Advertising
background image

107396-01F

For more information, visit www.desatech.com

For more information, visit www.desatech.com

6

Figure 13 - Installing Cylinder Cover

Shoulder
Screw

Cylinder
Cover

Slide Over
Shoulder Screw

Tab

OPERATION

LIGHTING INSTRUCTIONS

1.

Remove cylinder cover by lifting up and out.

2.

Using only a 20 lb. propane/LP cylinder, not included (see safety
information for proper cylinder selection), connect the hose/regu-
lator assembly to the cylinder (see Figure 10, page 5). The hose
should already be connected to the heater. When connecting
regulator assembly to cylinder valve, hand tighten nut clock-
wise to a positive stop. DO NOT use a wrench to tighten. Use
of a wrench may damage quick closing coupling nuts and re-
sult in a hazardous condition.

3.

Place the cylinder inside the base with the regulator to front of
base assembly. Make sure the bottom collar of the cylinder is
in front of the tab in the base (see Figure 11).

4.

Turn heater valve to OFF position.

5.

Turn cylinder supply valve fully counter clockwise to OPEN
position.

6.

Use a soapy water solution to check the connection. For leaks
before attempting to light heater. If leak is found, turn cylinder
valve to CLOSE and do not use until all leaks are corrected.

7.

Replace cylinder cover by sliding cover over shoulder screw
while inserting tab in base (see Figure 13).

8.

Push knob in and turn counter clockwise to the PILOT position.

Ventilation
Openings

ASSEMBLY

Continued

Figure 11 - Installing Propane/LP Cylinder

20 lb.
Propane/LP
Cylinder

Tab in
Base

Gas Valve
Knob

Figure 12 - Installing Gas Valve Knob

Piezo Ignitor

ASSEMBLY
OPERATION

Gas Valve
Stem

Intake Air Opening

Intake Air
Openings on
Both Sides of
Cover

11. Place the cylinder inside the base with the regulator to the front

of base assembly. Make sure the bottom collar of the cylinder
is in front of the tab in the base (see Figure 11).

12. Verify valve on heater is in OFF position.

13. Turn cylinder supply valve fully counterclockwise to the OPEN

position.

14. Use a soapy water solution to check all connections for leaks

before attempting to light heater. If leak is found, turn cylinder
valve to CLOSE and do not use until all leaks are corrected.

15. Turn cylinder supply valve fully clockwise to CLOSE position.

16. Plug ignitor wire back into piezo ignitor and replace control

cover (see Figure 7, page 5).

17. Install knob onto gas valve stem aligning “d-flat” (see Figure 13).

18. Install shoulder screw, provided, into center hole at bottom of

back plate (see Figure 13).

19. Place cylinder cover over this screw while inserting tab in base

(see Figure 13).

Advertising