American Energy Systems BC7000 Auger Housing User Manual
Page 7
Advertising

F:\AESBusinessSystems\AES Technical\Piece part instructions\BC7000 Auger Housing
Assembly.doc
• Compress the spring until the shaft protrudes ½” through the right side of the 3” tube.
• Make sure the metal plate is vertical and the rod bend is pointing up.
• Tighten screw on metal plate. The dimension from the Base to the top of the Front Face is 29
15/16”. Gasket must layer at a minimum of 30 1/16” for proper seal between the Top Lid
and Hopper.
• The ideal gasket compression is 1/8”
• Before installation of top,
check to be certain gasket
material is correct height for
good seal around hopper. If
OK, carefully position top over
hopper and front of unit.
½
½
Advertising