Electrical installation – Da-Lite Tensioned Contour Electrol User Manual

Page 4

Advertising
background image

4

Electrical Installation

1. Open the junction box on the left end of the case using a

#2 Phillips screwdriver. Install electrical connections that
apply to your unit. Make sure to review the wiring diagram
for proper hook up. Replace the junction box cover.

NOTE: Must be installed in accordance with the
requirements of the Local Building Codes, the Canadian
Electrical Code (CEC), CAN/CSA C22.1 and the National
Electric Code (NEC), NFPA 70.

2. Test installation by running screen up and down a few times.

Be prepared to stop screen should any objects obstruct the
movement of the screen. To prevent damage to the motor,
the standard duty cycle is 1 minute on and 3 minutes off.

Figure 5

Junction
Box Cover

Advertising