Pre-installation installation – Da-Lite Tensioned Dual Masking Electrol User Manual

Page 3

Advertising
background image

3

Pre-Installation

Installation

1. Carefully unpack screen and remove outer wrapping from case.

2. Make sure to recheck measurements of screen

location before installation.

3. Remove center support brackets (on 8' and wider screens only),

reverse brackets and reinstall flush with the top of the box

1. Install screen by raising unit into position between joists at

one end only. Install one lag screw in each mounting bracket.

2. Level unit lengthwise with a carpenter’s level and plumb level.

Secure opposite end.

CAUTION! Do not seal in until screen has been secured in

position and properly tested for satisfactory operation.

ATTENTION! Ne fixez pas l'écran jusqu'à ce qu'il ait été

correctement mis en place et qu'il fonctionne
convenablement.

3. Carefully remove three shipping brackets by removing six hex

head screws from case and three phillips head screws from
aluminum slat. Use a phillips screwdriver, a hex socket and a
ratchet. Slat should move freely (Fig. 1).

4. Detach access panel by removing screws (Fig. 1).

5. Remove junction box cover plate.

6. Install electric hook up that applies to your unit. Make sure to

review your electrical installation checklist and wiring diagram
(included) for either 120 volt switch, 220/240 volt switch or low

voltage control.

NOTE: Must be installed in accordance with the requirements of
the Local Building Codes, the Canadian Electrical Code (CEC), CAN/
CSA C22.1 and the National Electric Code (NEC), NFPA 70.

CAUTION! Do not cut tape on fabric with a knife or any sharp
tool. Remove by hand.

ATTENTION! Ne coupez pas le ruban adhésif sur la toile avec

un couteau ou un outil tranchant. Retirez à la main.

7. Carefully remove two wood boards securing mask surface to case.

8. Use supplied 1/8” nex key and a 5/16” wrench to remove silver

shipping brackets attached to slat and screen case.

9. Test installation by carefully running picture and mask surfaces up

and down several times. Be prepared to stop screen. Standard
Duty Cycle: 1 MIN. ON / 3 MIN. OFF.

NOTE: When rolled down, the picture surface should wrap fully
around the roller. No part of the roller should be exposed. Picture
and mask surfaces will automatically stop in the down position.

The mask will start down off the front of the roller, travel completely

down past the bottom of the viewing surface, then “step back”
against the viewing surface to eliminate shadowing by rolling up
the back side of the roller. Do not adjust the limits to change this
feature.

10. Run the picture and mask surfaces upward. When the picture and

mask surfaces are fully up the limit switches (in the motors) are
tripped and the motors shut off.

11. Check for satisfactory condition by operating screen a few times.

Reinstall access panel.

Figure 1

Figure 2

Drywall Screw

Access Panel

Machine Screw

Phillips Head Screw

Shipping Bracket

Picture Surface

Mask Surface

Mask Motor

Screen Motor

Hex Head Screw

Advertising