Instructions, Heavy duty fast-fold® deluxe frame construction – Da-Lite Heavy Duty Fast-Fold Deluxe Screen System User Manual

Page 2

Advertising
background image

2

Instructions

1. Unfold the 4 sections of Heavy Duty Fast-Fold

®

Deluxe frame,

lock all latches and lay face up on the floor. See Figure 1.

2. Attach top and bottom sections to side sections and tighten the

Speedy Cranks securely. See Figures 2 and 3. Mount Back Braces
to the top and bottom sections (for screens 22' and wider) and
tighten the winghead screws securely.

Figure 1

Top Section

Top Section

Stage Right
Side Section

Stage Right
Side Section

Stage Left
Side Section

Bottom Section

Bottom Section

Figure 2

Stage Left
Side Section

Figure 3

Top Section

Side
Section

Top/Bottom Section

Side Section

Heavy Duty Fast-Fold® Deluxe Frame Construction

Heavy Duty Leg

Side Frame

A-Brace

Anti-Sway Brace
(Mounted Inside When
Used Without Drapes)

Top Frame

Anti-Sway Brace
(Mounted Outside When
Used With Drapes)

Bottom Frame

Back Brace
Mounted To Both
Top And Bottom Of
Frame – For Screens
22' And Wider

Advertising