Planning, Trenching, Leaving jobsite – Ditch Witch RT30 User Manual
Page 35
Advertising

Operation Overview - 34
RT30 Operator’s Manual
Planning
CMW
Planning
1. Gather information about jobsite. See page 36.
2. Inspect jobsite. See page 37.
3. Classify jobsite. See page 38.
4. Select chain and teeth to match your soil type, if necessary. See page 58.
5. Check supplies and prepare equipment. See page 40.
6. Haul equipment to jobsite. See page 49.
Trenching
1. Start unit. See page 42.
2. Position tractor and controls. See page 54.
3. Begin trenching. See page 55.
4. Complete the installation. See page 55.
5. Backfill the trench. See page 62.
6. Shut down tractor. See page 44.
Leaving Jobsite
1. Backfill if necessary. See page 62.
2. Rinse equipment. See page 62.
3. Stow tools. See page 62.
4. Haul equipment away from jobsite. See page 49.
Advertising