Dunkirk DWB Series User Manual

Page 2

Advertising
background image

11.

Remove any call for heat or hot water.

12.

Turn gas and electric power ON.

13.

Power up boiler.

14.

Configure control for proper boiler size and type.

15.

To access the Parameter “tS” menu:
• Press and hold Reset button for 10 seconds, display

will read “tS”, release button.

• Press the Reset button for 1 second, display will read

“P01”.

• Press Heating buttons to scroll the list of parameters.

Press DFHW buttons to view or change a parameter.

Two Parameters need to be set “P01 & P02” as shown

in figure 4.

16.

To access Configuration menu:
• Press DHW + & - (both) buttons and hold for 10

seconds; “b01” will appear flashing.

• Press Heating buttons to scroll Configuration list.

Press DHW buttons to view or change a setting.

• Configuration “b01” is only one to be changed per

chart in Figure 6.

• When proper size is selected, press and hold DHW

+ & - (both) buttons for 10 seconds to exit, or turn

power off then on, or wait two minutes for auto exit.

• Boiler is now ready for operation

17.

Verify proper operation by following START UP

PROCEDURE in Installation, Operation & Maintenance

Manual.

18.

Install front jacket casing following instructions found in

Installation & Maintenance Manual.

CONTROL BOARD REPLACEMENT KIT

Parameter Description Setting

b01

Curve

Selection

Default =2

b01

CHB-100

0

b01

CHB-130

1

b01

CCB-150

2

Figure 4 - Enter Configuration Menu

CH

DHW

Figure 6 - Proper Size Settings

Figure 4 - Enter Parameter "tS" Menu

tS Menu

CCB-150

CHB-100

CHB-130

P01

Gas

Type

0=Natural

Gas; 1=LP

Gas

0=Natural

Gas; 1=LP

Gas

0=Natural

Gas; 1=LP

Gas

P02 Boiler

Type

1

2

2

Advertising