Statutory requirements, Testing and certification, Ce mark – Glow-worm Clearly Heat Pump - Buffer Vessel User Manual

Page 5: Important

Advertising
background image

5

Statutory Requirements

Testing and Certification

This buffer vessel is tested and certificated for safety and

performance. It is, therefore, important that no alteration is

made to the vessel, without permission, in writing, by Glow-

worm.

Any alteration not approved by Glow-worm, could invalidate

the certification, warranty and may also infringe the current

issue of the statutory requirements.

CE Mark

The CE mark on the buffer vessel indicates that it complies

with the basic requirements of the applicable directives.

IMPORTANT

Where no British Standards exists, materials and equipment

should be fit for their purpose and of suitable quality and

workmanship.

The installation of this buffer vessel must be carried out by a

competent person.

Manufacturer’s instructions must not be taken as overriding

statutory requirements.

Statutory Requirements

In GB, the installation of the buffer vessel must comply

with the requirements of the current issue of the following

regulations:

- Electricity at work act.

- Health and safety at work act

- Relevant Utility supplier’s regulations.

- Water regulations and by-laws.

- Environment agency and local council requirements

regarding bore holes, water courses, or noise levels.

- Gas safety installation and use regulations concerning

any associated gas fired heat source used within the

heating system.

- Building regulations part “L” and directives concerning

energy saving

- Building regulations such as G3 covering Hygiene and L8

Legieonella.

- COSHH regulations

- Other relevant bodies such as HETAS and OFTEC

Advertising