1 installation instructions – Glow-worm Energy Saver Combi 2 and Gas Valve User Manual

Page 6

Advertising
background image

6

221854B

1.1 Installation

Where no British Standards exists, materials and equipment
should be fit for their purpose and of suitable quality and
workmanship.

When installing the appliance, care should be taken to avoid any
possibility of personal injury when handling sheet metal parts.

The installation of this boiler must be carried out by a competent
person in accordance the rules in force in the countries of
destination.

Manufacturer’s instructions must not be taken as overriding
statutory requirements.

1.2 Gas Supply

This boiler is for use only on G20 natural gas.

The gas installation must be in accordance with the current
issue of BS6891.

The supply from the governed meter must be of adequate size
to provide a steady inlet working pressure of 20mbar (8in wg) at
the boiler.

On completion, test the gas installation for soundness using the
pressure drop method and suitable leak detection fluid, purge in
accordance with the above standard.

1.3 Data Label

The data label is on the base panel inside the appliance.

1.4 Electrical Supply

The boiler must be earthed.
All system components shall be of an approved type and all
wiring to current I.E.E. wiring regulations.

The boiler must be connected to a permanent 230V ac, 50Hz
supply.

Connection of the whole electrical system of the boiler, including
any heating controls, to the electrical supply must be through
one common isolator.

Isolation should be by a double pole switched fused spur box,
with a minimum gap of 3mm for both poles. The fused spur box
should be readily accessible and preferably adjacent to the
appliance. It should be identified as to its use.

1 Installation Instructions

Diagram 1.1

Alternatively connection can be made through an unswitched
shuttered socket and 3A fused 3 pin plug.

The mains supply cable and other cables connected to the
boiler must be the PVC flexible type of at least 0.75mm

2

(24/

0.20mm).

The colours of three core flexible cable are, blue - neutral,
brown - live, green and yellow - earth.

The wire coloured blue must be connected to the terminal
marked “N” or “Black”.

The wire coloured brown must be connected to the terminal
marked “L” or “Red”.

The wire coloured green and yellow must be connected to the
terminal marked “E” or “Green” or the earth symbol

.

1.5 Condensate Drain

A plastic drain pipe

must be fitted to allow discharge of

condensate to a drain.

Condensate should, if possible, be discharged into the internal
household draining system. If this is not practical, discharge can
be made externally into the household drainage system or a
purpose designed soak away, see section 9.4 for more details.

1.6 Boiler Efficiency

The Seasonal Efficiency Domestic Boilers UK (SEDBUK) is:

Energysaver Combi 2-80: 90.6%

Energysaver Combi 2-100: 90.1%

The value is used in the UK Government’s Standard Assessment
Procedure (SAP) for energy rating of dwellings. The test data
from which it has been calculated has been certified by Gastec.

CL

BOILER

CONDENSATE
SIPHON

INSIDE WALL
FIXING FACE

CAP

Condensate Drain

Connection

101

145

373

208

520

118

33

140

REFER TO THE WALL TEMPLATE
FOR PIPE DIMENSIONS

140

9053

890

Advertising