5 boiler installation – Glow-worm Micron 40FF User Manual

Page 16

Advertising
background image

16

221911E

MAINS
SUPPLY
230V~50Hz

BLOCK
CONNECTOR

bl

L

S

N

g/y

g/y

g/y

br

b

bl b

b

Diagram 5.10

5 Boiler Installation

SECURING
SCREW

12384

CONTROL
BOX

5.8 Pump Connection

The pump must be connected to the external controls.

5.9 Testing

Checks to ensure electrical safety must be carried out by a
competent person.

After installation of the system, preliminary electrical system
checks as below should be carried out:

Diagram 5.9

TOP
TURRET

6793

GASKET

SCREWS

(4)

TOP TURRET
FLUE OUTLET

FLUE
DUCT
EXTENSION

HINGE PIN

Diagram 5.8

CABLE
CLAMP

GROMMET

1. Test insulation resistance to earth.

2. Test earth continuity and short circuit of all cables.

3. Test the polarity of the mains.

The installer is requested to advise and give guidance to the
user of the controls scheme used with the boiler.

Fit the casing.

Diagram 5.11

7333

TAIL PIPE

TUBING
NUT

AIR VENT

RETURN

FLOW

RUBBER
WASHER

7665

AIR
DEFLECTOR

WING NUT

TAPTITE

SCREWS (2)

SELF-TAP

SCREWS (2)