Labconco Clear Drying Chamber User Manual

Page 2

Advertising
background image

Labconco Instruction Sheet 7417100, Rev A, ECO D164, 7/05 2 of 5

Installation on FreeZone 6, 12, and 18 Liter Freeze Dry Systems

1. Place the rubber gasket over the 3inch port on top of the base unit.

2. Position the base and gasket assembly on top of the gasket. When installing the large

chamber, make sure the lip of the gasket is facing upward.

3. Place the clear chamber on top of the base and gasket assembly.

4. Place the top with gasket assembly on the top of the chamber.

Top & Gasket Assembly

Clear Chamber

Base & Gasket Assembly

Gasket

Advertising