Royer Labs R-101 Shock Mount Band Replacement User Manual

R-101 shock band replacement instructions

Advertising
background image

R-101 Shock Band Replacement Instructions

Due to environmental conditions and natural properties, all elastic bands eventually require

replacement. Replacing the bands on the shock mount provided with the R-101 is an easy

process using the bands and o-rings provided in this replacement kit. Before beginning,

please check to make sure that you received all of the required and extra components:

3 shock bands (includes 1 extra)

10 small neoprene o-rings (includes 2 extra)

6 large neoprene o-rings (includes 2 extra)

1. Pull 1

st

shock band straight and roll small o-rings onto band about !” from ends. Adjust

location of loops on the band such that the adhesive seam of the band is !” to the inside

of the o-ring location.

2. Fold band in half and roll 2 more small o-rings onto band about !” from ends.

Seam

Seam

Advertising