N6 housing – SOR TA Nuclear Qualified Temperature Switch User Manual

Page 3

Advertising
background image

Form 655 (04.13) ©SOR Inc.

3/8

N6 Housing

Remote Mount

Direct Mount

Cover

Screws

1/8” NPT(F)

Vent

Connection

Body

Process

Connection

Sensing Bulb

3/4” NPT(F)

Conduit Connection

Mounting
Holes

Sensing

Bulb

1/8” NPT(F)

Vent

Connection

Process

Connection

Gland

Nut

Capillary

Cover Screws

Mounting
Holes

Retainer

3/4” NPT(F)

Conduit Connection

Mounting Hardware Fasteners per SOR Test Report 9058-102 consist of two 1/4-20,
Grade 5 screws (not supplied). Torque screws to 70 to 85 in-lbs.

Maintenance Replace cover gasket (SOR P/N 8923-180) whenever cover is removed or
minimum of once every 5 years, whichever comes first. Remove the four cover screws.
Remove the old gasket. Place new gasket between housing and cover. Line up holes in
cover, gasket and housing. Insert the 4 screws and torque each to 7 to 10 in-lbs.

Advertising
This manual is related to the following products: