22 -SC-IW Installation Manual
Step 8 - Finish Wallr
The wall can now be finished in a traditional fashion utilizing the appropriate drywall thickness, standard texturing
and finishing methods. Be sure to advise the “finishing” contractors that they are to drywall up to the edge of
the template, as the template is the place holder for the installation of the designer template grille..
Figure 20: Finish Wall
Step 9 - Verify Drywall was Properly Installed
Once the wall is finished, the installer must revisit the installation site and verify that the contractors have
properly used the mudring as their a guide leaving an opening that is approximately 17 1/2” x 4 1/2”.