Reassembly points – Desa PG15EA User Manual

Page 8

Advertising
background image

www.desatech.com

115423-01A

8

REASSEMBLY POINTS

Because this is an outdoor product where the

control of water is important, the following steps

for assembly must be followed.
1. The closed cell foam gasket must seal the hex

shaped pan to the inside of the plastic housing

(see Figure 8). The seal is to be completely

even in the corners of joined parts.

2. The tubular heating element rubber sealing

washers must be against the top surface of the

steel pan and under the brass flat washers as

shown in Figure 9. Nuts on opposite side of pan

must be tightened 1/2 turn past finger tight.

3. Apply a SMALL drop of thread locking seal-

ant (rated to 300° F, such as Loctite Thread

Locker Blue) to each of the thermal reset

switch mounting screws (see Figure 10).

Torque screws to 6 to 9 inch-pounds.

4. The tip switch cover must isolate tip switch

from metal base as shown in Figure 11.

5. To complete grounding of heater, all ground

wires must be fixed with screws as originally

assembled by the manufacturer. Additionally,

internal tooth washers must be against the steel

pan and under nuts as shown in Figure 12, for

the tubular heating element.

6. No wires should be seen through openings in

bottom of heater (see Figure 13).

Figure 8 - Foam Gasket

Figure 9 - Tubular Heating Element

Sealing Washers

Figure 10 - Thermal Reset Switch

Mounting Screws

Figure 11 - Tip Switch Cover

Figure 12 - Grounding of the Tubular

Heating Element

Figure 13 - Air Openings in Bottom of

Heater

Brass Flat
Washer

Rubber
Sealing
Washer

Advertising
This manual is related to the following products: